Friday, April 26, 2013
Architectural work in collaboration with Copeland Associates: 2006
Wednesday, April 24, 2013
Work as Construction Supervisor, Avatar: 2007-8
SAMSON: THE DRAWINGS |
SAMSON: PLACING FLOOR STRUCTURE ON SKIDS |
SAMSON ROOF STRUCTURE |
CONSTRUCTION WORKSHOP |
SAMSON ON SPFX GIMBAL |
SAMSON: SOME OF THE TEAM |
THE DRAGON ROOF STRUCTURE |
THE DRAGON FRAMED UP |
SKINNING THE DRAGON |
THE DRAGON NEARING COMPLETION |
SHIPPING THE DRAGON TO LA |
VALKYRIE CARGO BAY |
BIO-LINK FLOOR |
AMBIENT ROOM |
GLASS BALUSTRADE |
LINK ROOM |
BIO-LAB CORRIDOR |
COMMISSARY AIR LOCK |
OPS CENTER UNDER CONSTRUCTION |
SHACKS INTERIOR |
SHACKS INTERIOR |
SHACKS EXTERIOR |
Tuesday, April 23, 2013
Design work for feature film: The Adventures of Tintin: 2009
Subscribe to:
Posts (Atom)